The house is finished. The ground around it often isn't. On a knockdown-rebuild block you might be looking at a pile of spoil beside the driveway, ground packed hard down the side, and a drop from the back door into the yard. Every handover is different, so start with what's actually there.

The order that works on most blocks is simple: clean up, set the levels, sort the drainage, build any retaining walls, then put in the driveway and paths. Planting comes after the heavy work. Plan the garden beds from the start, though, because their edges and soil levels have to fit around everything else.

What you may inherit after the build

Expect some mix of leftover spoil, compacted ground and levels that were set for the slab rather than for a garden. Walk the block before you decide what stays and what goes.

That heap in the corner is often soil from the footings or service trenches. On other blocks it's been spread thin across the yard. Either way, whether it can stay depends on what's underneath and what you want to build on that spot.

Pay attention to wherever trucks, bins and machines have been driving. That ground can be hard to dig and slow to drain. Backfilled service trenches can settle, leaving a dip running through an otherwise flat yard. Broken concrete and offcuts sometimes turn up just under the surface once you start digging.

Check the ground right against the house too. It might sit high on a wall, fall back towards the house, or step down sharply at a boundary. Not every rebuild has these problems, but they're worth looking for.

The best time to look is after a decent rain. Note where water sits, where the ground stays soggy and where anything is running towards the house. Then compare it with the builder's site and drainage plans.

Clean-up and site preparation

Clear and check the ground before anything gets built on it. Rubble, loose spoil and soft spots left under a driveway, paving or a wall are a common cause of cracking, sinking and movement later.

Our drainage and site preparation work starts with what's on the block and what's planned for it. On a rebuild that can include:

  • sorting the leftover rubble and spoil, and working out what can stay and what has to go
  • digging out the areas that will carry concrete, paving or walls
  • dealing with soft or disturbed ground under the new surfaces
  • planning how the excavator and skid steer get in and out without damaging the new house, the crossover or the neighbours' place

Access catches people out. Once the house is up, the side gap may be the only way a machine can reach the back. Pour a path down there too early and the rest of the job gets a lot harder. Move spoil while you still have a clear run at it, too. A raked-over yard can look tidy and still have rubbish and soft ground a spade-depth down.

Levels and drainage first

Lock in the levels and the drainage before you build anything that depends on them. Once a slab is poured or a wall is up, changing a level usually means ripping out finished work.

Start with the points that have to meet: garage slab to driveway, door threshold to path, top and bottom of any retaining wall. Check those against the boundaries and the street. Then set the falls so surface water heads somewhere it's allowed to go, away from the house, paths and walls.

A patch can look dead flat from the back door and still hold a puddle where it meets the path. Those joins matter as much as the open yard.

Where the water goes

A new house adds a lot of roof and hard surface, and that water has to end up somewhere suitable. Pooling or water running back at the house usually points to poor falls, missing drains or a downpipe with no proper connection. Find the cause before you pick a fix.

Surface water is handled with falls and pits. Ag pipe deals with water in the ground, behind walls and under surfaces. It helps, but it won't make up for falls that are wrong.

Ask your builder what stormwater pipes went in and where they run. Any new connection into that system is a job for a plumber, and the landscape drainage should tie into what's there, not double up.

Every bit of drainage needs a suitable outlet. Water can't simply be sent down the driveway to the street or onto the neighbours, so the outlet gets checked before the layout is settled. If your council has stormwater requirements for your block, we'll confirm what applies to your job.

Making the levels suit the yard

This is where you decide how you'll actually use the place: a flat patch for the kids, a level spot outside the back door, a gentle slope down to a side path. If there's a deck on the list, its height has to work with those same levels.

Retaining walls where the block changes height

Where the block steps up or down, a retaining wall is often how you turn a slope into flat, usable ground. Set its position and heights with the rest of the levels, so the driveway, paths and beds can tie into the top and bottom.

Rebuilds commonly need walls along a boundary, beside the driveway or where the yard was cut down for the new slab. What sort of wall, and how it's built, depends on the ground and what it's holding back.

We build retaining walls with concrete sleepers on steel posts, and timber sleeper walls, which suit lower garden walls and edging. Our guide on how a concrete sleeper retaining wall is built goes through it step by step.

Every wall we build gets drainage behind it: an ag pipe at the base, clean gravel backfill and geofabric, with the water taken to a suitable outlet. Water building up behind a wall is one of the main reasons walls lean or fail, and freshly disturbed ground on a rebuild can hold plenty of it. Our guide on why retaining walls fail explains why.

Permits and engineering for walls

Whether a wall needs engineering or a permit depends on its height, what it holds back and how close it sits to boundaries, driveways or buildings. Taller walls and walls carrying extra load, like a driveway or a house above, often need engineering, and some need a permit.

We flag this early so it doesn't stall the job halfway through. Don't assume a low wall is exempt just because it looks simple. Check with your council for your block, and we'll confirm what applies to your job.

Driveway and paths

The driveway and main paths go in after the levels, drainage and walls are sorted. They're the biggest hard surfaces on the block, so they need a solid base and falls that carry water to a suitable outlet, not back towards the house or the garage.

Out the front, the driveway has to meet the garage slab, the crossover and the street at sensible levels. The crossover is the section between your boundary and the road. Councils usually need a vehicle crossing permit for any work on it, separate from a building permit, so check with your council. We'll confirm what applies to your job.

Most driveway problems come back to what's underneath. For exposed aggregate driveways, we dig out to suit the soil, compact a proper base and set the falls away from the house. After the pour, the surface paste is washed off to show the stone. That gives the surface good grip, though the stone mix, the finish and any sealer all change how it feels underfoot.

Pavers are the other common choice. They go down on a compacted base with the right falls, and they have more character than plain concrete. Our guide comparing exposed aggregate, plain concrete and pavers sets out the trade-offs.

Paths and paved entries need the same base and falls. Plan their edges with the walls and driveway, especially where two surfaces meet and a low spot could hold water.

Wide exposed aggregate driveway in front of a brick home
A finished exposed aggregate driveway in front of a brick home.

Garden beds and drip irrigation

Plant last, but plan the beds first. Bed edges, soil levels and irrigation lines are far easier to sort out before the paths and paving close everything in.

Mark out where the beds meet the driveway, paths and walls. That way the edging is part of the build instead of an awkward strip you deal with later.

Check the planting soil too. On a rebuild it's often compacted or mixed with fill, so it may need digging over or replacing before anything goes in.

Drip irrigation is easiest to plan while the beds and levels are being set up. Lines can then go in before paths and paving cut off access.

Photos and plans that help assess the block

Quotes are free and start from photos and any plans you have. If drainage or levels need a closer look, an on-site assessment may be needed, and it may be charged depending on project location and scope.

Useful things to send:

  • wide shots of the whole yard, front and back, from a few angles
  • access from the street and down the side of the house
  • spoil heaps and any spots where the block changes height
  • water pooling after rain, plus where the downpipes and drains are
  • the builder's site plan or drainage plan, if you have one
  • a rough sketch of what you want: driveway, paths, walls and garden beds

ANKERMANN Landscape works on blocks like this across Melbourne's East and South-East. When you're ready, send your photos through the contact page.